Share on FacebookShare on TwitterShare on LinkedinEmail this link
Fuller Ave & Robert St. E Intersection Upgrade Project
The Town of Penetanguishene (‘Town’) has initiated a Schedule ‘B’ Class Environmental Assessment (Class EA) to address the intersection improvements required at Fuller Avenue and Robert St. E. as recommended in the 2018 ‘1145 Fuller Avenue Traffic Impact Study’ (JD Northcote Engineering Inc.). The proposed study area is located at the intersection of Robert St. E and Fuller Ave. and extends approximately 100m in all directions (north, south, and west).
Preliminary Class EA Report:
A Preliminary Study report is completed and has identified preliminary design alternatives. The results of the preliminaryContinue reading
Fuller Ave & Robert St. E Intersection Upgrade Project
The Town of Penetanguishene (‘Town’) has initiated a Schedule ‘B’ Class Environmental Assessment (Class EA) to address the intersection improvements required at Fuller Avenue and Robert St. E. as recommended in the 2018 ‘1145 Fuller Avenue Traffic Impact Study’ (JD Northcote Engineering Inc.). The proposed study area is located at the intersection of Robert St. E and Fuller Ave. and extends approximately 100m in all directions (north, south, and west).
Preliminary Class EA Report:
A Preliminary Study report is completed and has identified preliminary design alternatives. The results of the preliminary report are to be presented to the public through a virtual Public Information Centre (‘PIC’).
A PIC is being held to provide an opportunity for the public to review and provide input on Fuller Ave / Robert St. E Intersection upgrade alternatives under consideration. The PIC will consist of a short presentation followed by a question-and-answer period. Representatives from the project team will be present to provide the presentation and answer questions regarding the preliminary study report.
Information will be collected in accordance with the Freedom of Information and Protection of Privacy Act (‘FIPPA’). With the exception of personal information, all comments will become part of the public record.
Intersection Upgrade Project is currently at this stage
This consultation is open for contributions.
Under Review
this is an upcoming stage for Intersection Upgrade Project
Contributions to this consultation are closed for evaluation and review. The project team will report back on key outcomes.
Final report
this is an upcoming stage for Intersection Upgrade Project
The final outcomes of the consultation are documented here. This may include a summary of all contributions collected as well as recommendations for future action.